Main
Home Inspection
Wind Mitigation
Wind Mit. Education
Insurance Inspections
Testimonials
Upgrade Your Home
Service Area
Service List
Related Links
Current Events
To meet Section 8, titled Secondary Water Resistance (SWR), your home must have a self adhering polymer modified bitumen roofing underlayment applied directly to the sheathing. This would involve replacing your roof (See Section 2 & 3).
Tape Underlayment Spray Foam SWR Seal
Another, yet less commonly utilized way to meet the SWR Section is by having a foam SWR applied as a secondary means to water intrusion. This involves spraying foam at the point where the truss meets the roof deck. This is not hard to do but takes some time and should be done by a licensed contractor.
| Covering |
| Attachment |
| Roof To Wall |
| Geometry |
| Water Resistance |
| Opening Protection |
| Section 1,2,3,5 |
| Section 4 |
| Section 6 |
| Section 7 |
| Gable End |
| Plywood Shutter Video |