Main
Home Inspection
Wind Mitigation
Wind Mit. Education
Insurance Inspections
Testimonials
Upgrade Your Home
Service Area
Service List
Related Links
Current Events
To meet Section 4, titled Roof to Wall Attachment you must have one of five different categories of attachments installed.
1) You must have a toe nail going through the truss into the top plate (Pic 1)
2) OR a clip on every truss nailed to one side with a minimum of 3 nails (Picture 2)
3) OR a single metal wrap on every truss with 2 nails on one side and 1 nail on the other (Picture 3)
4) OR a double metal wrap on every truss with 3 nails on one side and 1 nail on the other (Picture 4)
5) OR anchor bolts, or a concrete roof (Picture 5)
| Covering |
| Attachment |
| Roof To Wall |
| Geometry |
| Water Resistance |
| Opening Protection |
| Section 1,2,3,5 |
| Section 4 |
| Section 6 |
| Section 7 |
| Gable End |
| Plywood Shutter Video |